You may remember that Mike and I did a wilderness first aid course in a wood.
This was an excellent 2 day course and prepared us well for all kinds of eventualities. Andy is coming to run the course in our woodland near Rye on the 21 and 22 July 2012. I fully recommend this course. Please contact us if you would like to come along.
The training is interesting, high quality and realistic and the price reasonable. The training is particularly relevant to those of us who are sometimes working in remote situations, and with trees and tools - but it also covers all kinds of first aid needs that we come across at work and in normal life.
Come and join us! Email
tracy@woodlands.co.uk
if you would like to know more
Monday, 9 April 2012
Wilderness first responder July 2012
Spring trees
It's not just flowers, butterflies and birds, the trees are waking up now as well. Birch always seems to be first off the mark:
But Hawthorn is catching up fast:
Hornbeam is a bit slower, but is now coming out, with the characteristic pink around its new leaves:
Hazel seems to be in different stages, for example the stools that were coppiced a year ago are just opening their buds:
while the more mature specimens are coming into leaf:
Sweet Chestnut is much slower that the others, but is starting to come out now:
But having talked about the trees, I really should mention the Wood Anemones again, which are building up to their peak now:
There should be some interesting developments in the patch of woodland next to ours soon. There's been some fairly major coppicing operations going on there for a few years now, so there's a big area with 0-3 years regrowth in it now. It looks quite drastic as it's a much larger area than we cut each year, but this is what the ecosystem here is used to, and depends on, so I'm expecting it will look great in the coming years:
Finally, the wild boar have once again decided that our 'pond' is a great mud bath:
Though they don't seem to be looking after the dam which is needed to keep it there:
It's mean to be wet today, as it's a Bank Holiday, but we do need the rain...
Mike Click here to read the rest of this post.
Friday, 6 April 2012
Easter butterflies
Well at least one day of the Easter weekend was sunny - and here's some butterflies to prove it. First, the always familiar Peacock:
There were also a few Commas around:
And this one, which had me puzzled until I realised it was a moth - it's an Orange Underwing:
Plenty of other wildlife around as well, like pesky rabbits:
and a nice little Robin:
While we were up there we had friends drop in for a freshly made bacon sandwich lunch, and then headed off to to some finishing touches to the EWB bridge that was built recently - just fastening down some chicken wire so the deck doesn't get slippery in the rain:
Weather looks a bit cloudy or wet for the rest of the weekend, so glad we made the most of it today!
Mike
Click here to read the rest of this post.
Thursday, 5 April 2012
Spring in the wood!
Well, it did seem as if Spring had truly arrived in the wood last week. Seems to have vanished for the moment, but here are some pictures captured at the end of March.
The best part of the woodland for plants at the moment is the newly coppiced area in Sweep wood. We started work there 2 years ago and the plants are loving the light!
The first bluebells of the year are coming out.
The brash piles we left around are being overcome by honeysuckle and look great. The birds are loving them!
Wood anemone are everywhere.
The whole area is covered.
The foxgloves are springing up as well!
Tracy
Click here to read the rest of this post.
Saturday, 31 March 2012
EWB Imperial - building a log bridge in the woods
Last weekend members of EWB UK from Imperial College London came down for what's become an annual camping trip to our woodland. As always, there was a project to get involved with - this time building a bridge over a stream that can support a vehicle! During previous visits they built a firewood shelter and a foot bridge, so this year was a step up in scale.
I made a timelapse video of most of the bridge building, it's about 7 mins long (it's in 1080p HD, so put it full-screen). Take a look, and then read the rest of the post to see the pictures and description.
Here's the full team that came down this year:
The bridge is needed to allow access to a new ride that I cut last winter. I saved some of the stems I'd cut to make parts of the bridge, and we felled a few others as required to complete it. The first steps were digging some foundations, which took quite a while:
and peeling the long logs that were going to be used as the main supports:
We put some chunky logs into ditches that had been dug on each side of the stream:
and then got the main supports in place, bolting them down later on:
In the centre of the stream we also drove in some stakes (see the timelapse video above), and I used the chainsaw to cut a notch in the top of them for the main supports to rest in:
On top of the main supports went some crossbeams (all of this was Sweet Chestnut, by the way), and again I cut some notches for them to sit in:
Then there was a lot of drilling and nailing...
Some of it by hand:
though we did have a solar panel and inverter on hand to recharge the electric drill:
Once that was finished, it was time to start making the ramps to lead on and off the bridge and also lay down some planks (the only bit of wood that was bought in for this):
The planks were also nailed down, and it was starting to look like it might be OK to drive on...
Of course, there's a signature on the side of the bridge:
We posed for a photo or two:
and then it was time to put it to the test...
There were some creaking noises, but it was rock solid!
A job well done - thanks to everyone who came from EWB Imperial to help with this!
Mike
Click here to read the rest of this post.